Northec Construction Inc. was awarded contract works for the Hallnor Road Industrial Park Watermain, phase 2, from highway 101 to 0.55 km North of Highway 101 for the Corporation of the City of Timmins.
The work mainly consists of the replacement of 565 metres of pre-insulated PVC watermain (300 mm) in open-cut and jack and bore including asphalt removal, rock excavation and paving.
The Corporation of the City of Timmins
$/1.5M
2016